会展英语(第二版)

当前位置:首页 > 外语 > 行业英语 > 会展英语(第二版)

  • 版 次:5
  • 页 数:
  • 字 数:
  • 印刷时间:2013年01月01日
  • 开 本:12k
  • 纸 张:胶版纸
  • 包 装:平装
  • 是否套装:否
  • 国际标准书号ISBN:9787307095373
作者:主编冯玮出版社:武汉大学出版社出版时间:2013年06月 
内容简介
  《高等院校会展专业系列教材:会展英语(第2版)》既可作为高校本科和专科会展专业、会展职业培训的教学用书,也可作为会展从业人员和有志于从事会展工作的学习者的自学参考用书。
  《高等院校会展专业系列教材:会展英语(第2版)》根据会展行业特点及工作要点,将内容分为两大部分:会议英语和展览英语。每一部分包括七个单元,每个单元均有五大模块:
  模块一:会展交际会话。内容涉及会展活动的主要环节和工作重点,包括会展业介绍、会展策划、会展预订、会展销售、会展接待、物流服务、会后旅游和展会评估。
  模块二:会展短文阅读。帮助学习者熟悉会展业务和工作要点,提高阅读理解能力。
  模块三:会展应用文写作。精选会展实务写作案例,帮助学习者提高会展商务英文写作能力,使他们能够撰写规范、简洁、流畅的会展商务应用文。
  模块四:会展案例。案例材料与会展业实际结合紧密,体现真实、实用的原则。每一案例均配有练习,包括问答题、判断题和词汇题。富有真实性和代表性的案例材料,可帮助学习者扩大专业词汇量和加深对会展行业的理解。
目  录
Part One English for Conventions
Unit 1 Talking about Convention Industry
Dialogue 1: What Makes a Great Convention City?
Dialogue 2: Booking a Meeting
Reading: The Historical Development of Convention Industry
Practical Writing: The Proposal to Host a Convention
Case Study: ICCA
Exercies
Unit 2 Planning of Meetings and Conventions
Dialogue 1: Planning for the Convention
Dialogue 2: Arranging for the Convention
Reading: The Routine Work of Meeting Planners
Practical Writing: Convention Lead Form
Case Study: Convention Connections, Inc.
在线试读部分章节

  Regular Booth(Single Storey/Raw Space)-Tuesday, 8 March
  It is the responsibility of the exhibiting company or appointed contractor to ensure that all rules and regulations are met.   Contractors   are required to have a layout plan available on-site for review by SEMI, the Fire Safety Bureau and SUNTEC Singapore.  If any constructed/constructing booth does not comply with any of the rules and regulations, this booth will be required to make modifications at exhibitor's/contractor's expenses.
  There are no union restrictions in Singapore.  If you, as the exhibitor, have contracted for raw space, you may use your own bona fide* personnel, hire labor through a temporary agency, or utilize the services of the contractor that built the booth. If you are having your booth built by the official contractor, PICO Art International Pte.  Ltd., labor will automatically be provided.
  Installation:  Hours and dates for installation, the exhibition, and dismantling are specified in the Timetable of Operations of this manual, Section l.  Extended hours for set-up can be requested on-site at SEMI Show Management office before 1,500 hours.  However, there will be an additional charge for the exhibit hall to remain open. Please contact SEMI for more information about overtime rates. All crates* must be tagged and ready for removal by 1,500 hours, Tuesday, 10 May.  Exhibitors will not be allowed to move in or install displays after this time.
  Dismantle: Exhibitors are required to maintain their exhibit intact until the close of the exhibition.  On the last exhibition day,  " dismantle"  procedures will be distributed to each exhibiting company. Each exhibitor will complete arrangements for the removal of exhibit material in accordance with the dismantle procedures. Exhibitors shall be liable for all storage and handling charges resulting from failure to remove materials from the exhibition hall before the conclusion of the dismantling period.
  Compressed air supply is available from either the floor service pits or electrically powered silent type air compressors.  Therefore, Exhibitors requiring air for demonstration purposes must provide full technical details to the Official Contractor-PICO  and  complete  Form  3  in  Section  9  " Order  Forms ". Compressors powered by internal combustion/fuel-type engines will not be permitted in the Exhibition Hall for safety reasons.
  ……


 会展英语(第二版)下载



发布书评

 
 

 

PDF图书网 

PDF图书网 @ 2017